Code Green Solutions
LEED for Existing Buildings 2.0 Gold certified on 04/26/2010
Loading...
63 Energy Star Performance Rating |
3% or 15% onsite renewable energy or offsite renewable energy |
50% diversion of waste from facility alteration and additions |
30% reuse, recycle or compost of ongoing consumables and durable goods |
10% reduction in indoor potable water use |
50% reduction in potable landscape water use |
Loading...
Loading...
This project is located at:
247 Highway, Kathleen, GA, USAActivity Type | LEED |
---|---|
Owner Type | Corporate |
Space Type | Industrial Manufacturing |
Project Size | 816,225 sq ft |
Certification date | April 26 2010 |
CBSA | Warner Robins, GA Metropolitan Statistical Area |
USGBC Chapter | Georgia Chapter |
EPA Region | EPA Region 4: Southeast |
ASHRAE Climate Zone | ASHRAE Climate Zone #3 |
Urban Rural Classification | NCHS Urban-Rural Classification: Small metro |
Electric Utility Provider | Flint Electric Membership Corp. |
This website collects and uses cookies to ensure you get the best user experience.
Please click on "Accept and Close" button to affirm your consent and continue to use our website. For more information, please view our Cookies Statement.