4575 US-90

Building

Building 4575 US-90

Pace, FL, USA

PEA RIDGE

Details

Icon-transparency Transparency

This building has a 1 year timeline with 1 green activity.

Timeline

PEA RIDGE
reported on 08/13/2016
GHG Emissions Reported
EPA GHG Reporting Program (2015)

Resources

Building Details

CBSA Pensacola-Ferry Pass-Brent, FL
USGBC Chapter Northern Gulf Coast Chapter
EPA Region Southeast
NHCS Urban Rural Classification Medium metro
ghg quantity reported metric tons co2 71953
Report a Data Problem