5050 HC 61 Box

Building

Building 5050 HC 61 Box

Chinle, AZ, USA

RRCS 1-8 Student L & L Center, RRCS K-8 Academic Building, RRCS 9-12 Student L & L Center + 1 more

Details

Icon-transparency Transparency

This building has a 5 year timeline with 6 green activities including LEED Gold and Silver certifications.

Timeline

RRCS K-8 Academic Building
awarded on 02/01/2012
Gold
LEED for Schools 2007
RRCS 9-12 Student L & L Center
registered on 06/12/2009
Registered
LEED NC 2.2
RRCS K-8 Academic Building
registered on 03/03/2009
Registered
LEED for Schools 2007
RRCS 1-8 Student L & L Center
registered on 12/01/2008
Registered
LEED NC 2.2
Rough Rock Community School
NCES Public Schools

Walk Score®: 0/100

Resources

Building Details

Owner Type(s) Other, Federal Government
Space Type(s) Higher Ed, K-12, Office
USGBC Chapter Arizona Chapter
EPA Region Pacific Southwest
NHCS Urban Rural Classification Noncore (nonmetropolitan)
school level Other
lowest grade taught Kindergarten
highest grade taught 12th Grade
school type Regular School
charter school No
operational status Open
Report a Data Problem