1775 Hitching Post Dr

Building

Building 1775 Hitching Post Dr

Green River, WY, USA

Northwest Pipeline Gp Green River C/S, NORTHWEST PIPELINE GP GREEN RIVER C/S, Sun Dog Compressor Station

Details

Icon-transparency Transparency

This building has a 5 year timeline with 4 green activities.

Timeline

Sun Dog Compressor Station
reported on 08/13/2016
GHG Emissions Reported
EPA GHG Reporting Program (2015)
NORTHWEST PIPELINE GP GREEN RIVER C/S
reported on 08/13/2016
GHG Emissions Reported
EPA GHG Reporting Program (2015)
Northwest Pipeline Gp Green River C/S
reported on 01/01/2013
GHG Emissions Reported
EPA GHG Reporting Program (2013)
Northwest Pipeline Gp Green River C/S
reported on 01/01/2012
GHG Emissions Reported
EPA GHG Reporting Program (2012)

Resources

Building Details

CBSA Rock Springs, WY
USGBC Chapter Wyoming Chapter
EPA Region Mountains and Plains
NHCS Urban Rural Classification Micropolitan (nonmetropolitan)
industry type sectors Petroleum and Natural Gas Systems
total reported direct emissions in metric tons co2e 28,072 , 29,851
note Emissions data reported to EPA as of 8/18/2014
ghg quantity reported metric tons co2 17389, 0
Report a Data Problem