Singa Durbar South Gate

Building

Building Singa Durbar South Gate

काठमाडौँ, Nepal

Marriott Hotel

Details

Icon-transparency Transparency

This building has an 8 year timeline with 2 green activities including a LEED Gold certification.

Timeline

Marriott Hotel
awarded on 01/17/2022
Gold
LEED NC 2009
Marriott Hotel
registered on 12/16/2015
Registered
LEED NC 2009

Walk Score®: 92/100

Resources

Building Details

Owner Type(s) Non-Profit (that do not fit into ot
Space Type(s) Lodging
Report a Data Problem