Strada Mihai Viteazu 1

Building

Building Strada Mihai Viteazu 1

Urlați, Romania

P&G Urlati F&HC Facility, P&G Urlati F&HC Facility Extension

Details

Icon-transparency Transparency

This building has a 3 year timeline with 4 green activities including a LEED Silver certification.

Timeline

P&G Urlati F&HC Facility Extension
awarded on 10/05/2022
Silver
LEED v4 BD+C NC
P&G Urlati F&HC Facility
awarded on 09/06/2021
Silver
LEED v4 BD+C NC
P&G Urlati F&HC Facility Extension
registered on 03/18/2021
Registered
LEED v4 BD+C NC
P&G Urlati F&HC Facility
registered on 05/18/2020
Registered
LEED v4 BD+C NC

Walk Score®: 5/100

Resources

Building Details

Space Type(s) Industrial Manufacturing
Report a Data Problem