Av. Valverde

Building

Building Av. Valverde

20,, Toledo, Spain

FM Logistic - Illescas Stage 1, FM Logistic - Illescas Stage 2, FM Logistic - Illescas Stage 3 + 2 more

Details

Icon-transparency Transparency

This building has an 8 year timeline with 9 green activities including a LEED Gold certification.

Timeline

FM Logistic - Illescas Stage 6
registered on 03/28/2023
Registered
LEED v4 BD+C WDC
FM Logistic - Illescas Stage 3
awarded on 02/02/2023
Gold
LEED v4 BD+C WDC
FM Logistic - Illescas Stages 4 and 5
registered on 04/20/2022
Registered
LEED v4 BD+C WDC
FM Logistic - Illescas Stage 3
registered on 02/23/2021
Registered
LEED v4 BD+C WDC
FM Logistic - Illescas Stage 2
awarded on 09/01/2020
Gold
LEED v4 BD+C WDC
FM Logistic - Illescas Stage 2
registered on 01/17/2020
Registered
LEED v4 BD+C WDC
FM Logistic - Illescas Stage 1
awarded on 05/07/2019
Gold
LEED v4 BD+C WDC
FM Logistic - Illescas Stage 1
registered on 02/28/2017
Registered
LEED v4 BD+C WDC

Walk Score®: 0/100

Resources

Building Details

Space Type(s) Warehouse and Distribution
Report a Data Problem