Terminal 3 Changi Airport Terminal 3

Building

Building Terminal 3 Changi Airport Terminal 3

Singapore

PRADA Changi Airport Terminal 3

Details

Icon-transparency Transparency

This building has a 1 year timeline with 2 green activities including a LEED Gold certification.

Timeline

PRADA Changi Airport Terminal 3
awarded on 03/10/2020
Gold
LEED v4 ID+C Retail
PRADA Changi Airport Terminal 3
registered on 01/02/2020
Registered
LEED v4 ID+C Retail

Walk Score®: 77/100

Resources

Building Details

Owner Type(s) Corporate: Publicly Traded
Space Type(s) Retail
Report a Data Problem