550 Cedar St

Building

Building 550 Cedar St

Newington, CT, USA

Cedar Point Phase 2

Details

Icon-transparency Transparency

This building has a 1 year timeline with 1 green activity.

Timeline

Cedar Point Phase 2
registered on 08/01/2022
Registered
LEED V4 BD+C HOLR

Resources

Building Details

Space Type(s) Multi-Family Residential
CBSA Hartford-West Hartford-East Hartford, CT
USGBC Chapter Connecticut Green Building Council
EPA Region New England
NHCS Urban Rural Classification Large central metro
Report a Data Problem