GBIG.org will be retired on March 31, 2026. Please ensure you have saved any materials you wish to retain before that date. Questions? Contact us

Equinix Data Center

Building

Building Equinix Data Center

Dubai Production Ci, Dubai, AE, 00000, AE

Equinix DX3.1

Details

Icon-transparency Transparency

This building has a 2 year timeline with 2 green activities including a LEED Silver certification.

Timeline

Equinix DX3.1
awarded on 12/13/2023
Silver
LEED v4 BD+C DC
Equinix DX3.1
registered on 09/11/2022
Registered
LEED v4 BD+C DC

Resources

Building Details

Owner Type(s) Corporate: Privately Held
Space Type(s) Datacenter
Report a Data Problem