Budova Port7

Building

Building Budova Port7

Nádraží 1637, Praha 7-Holešovice, Czechia

Port7 E

Details

Icon-transparency Transparency

This building has a 4 year timeline with 2 green activities including a LEED Platinum certification.

Timeline

Port7 E
awarded on 01/24/2024
Platinum
LEED v4 BD+C CS
Port7 E
registered on 03/30/2021
Registered
LEED v4 BD+C CS

Walk Score®: 72/100

Resources

Building Details

Space Type(s) Office
Report a Data Problem