6400 E Azure Ave

Building

Building 6400 E Azure Ave

Las Vegas, NV, USA

Speedway 15 Logistics Phase 1

Details

Icon-transparency Transparency

This building has a 3 year timeline with 2 green activities including a LEED Silver certification.

Timeline

Speedway 15 Logistics Phase 1
awarded on 08/01/2024
Silver
LEED v4 BD+C WDC
Speedway 15 Logistics Phase 1
registered on 07/14/2022
Registered
LEED v4 BD+C WDC

Walk Score®: 18/100

Transit Score®: 0/100

Resources

Building Details

Owner Type(s) Corporate: Privately Held
Space Type(s) Warehouse and Distribution
CBSA Las Vegas-Paradise, NV
USGBC Chapter Nevada Chapter
EPA Region Pacific Southwest
NHCS Urban Rural Classification Large central metro
Report a Data Problem