Badajoz45

Building

Building Badajoz45

LasCondes,SantiagoMetropolitanRegion,Chile

Torre Badajoz

Details

Icon-transparency Transparency

This building has a 3 year timeline with 2 green activities including a LEED Silver certification.

Timeline

Torre Badajoz
awarded on 06/07/2016
Silver
LEED CS 2009
Torre Badajoz
registered on 04/09/2014
Registered
LEED CS 2009

Walk Score®: 83/100

Resources

Building Details

Owner Type(s) Investor: Investment Manager
Space Type(s) Office
Report a Data Problem