Alyeska Pipeline Se/Taps Pump Station 01

Building

Building Alyeska Pipeline Se/Taps Pump Station 01

Prudhoe Bay, AK, 99734, USA

ALYESKA PIPELINE SE/TAPS PUMP STATION 01

Details

Icon-transparency Transparency

This building has a 7 year timeline with 5 green activities.

Timeline

ALYESKA PIPELINE SE/TAPS PUMP STATION 01
reported on 08/13/2016
GHG Emissions Reported
EPA GHG Reporting Program (2015)
Alyeska Pipeline Se/Taps Pump Station 01
reported on 01/01/2013
GHG Emissions Reported
EPA GHG Reporting Program (2013)
Alyeska Pipeline Se/Taps Pump Station 01
reported on 01/01/2012
GHG Emissions Reported
EPA GHG Reporting Program (2012)
Alyeska Pipeline Se/Taps Pump Station 01
reported on 01/01/2011
GHG Emissions Reported
EPA GHG Reporting Program (2011)
Alyeska Pipeline Se/Taps Pump Station 01
reported on 01/01/2010
GHG Emissions Reported
EPA GHG Reporting Program (2010)

Resources

Building Details

USGBC Chapter Cascadia Region Green Building Council
EPA Region Pacific Northwest
ASHRAE Climate Zone ASHRAE Climate Zone #8
NHCS Urban Rural Classification Noncore (nonmetropolitan)
Utility Provider Arctic Utilities, Inc.
industry type sectors Other
total reported direct emissions in metric tons co2e 100,601 , 92,640 , 91,589 , 92,325
note Emissions data reported to EPA as of 8/18/2014
ghg quantity reported metric tons co2 85080
Report a Data Problem