501 Southeast Loop 338

Building

Building 501 Southeast Loop 338

Odessa, TX, USA

Headlee Plant

Details

Icon-transparency Transparency

This building has a 7 year timeline with 5 green activities.

Timeline

Headlee Plant
reported on 08/13/2016
GHG Emissions Reported
EPA GHG Reporting Program (2015)
Headlee Plant
reported on 01/01/2013
GHG Emissions Reported
EPA GHG Reporting Program (2013)
Headlee Plant
reported on 01/01/2012
GHG Emissions Reported
EPA GHG Reporting Program (2012)
Headlee Plant
reported on 01/01/2011
GHG Emissions Reported
EPA GHG Reporting Program (2011)
Headlee Plant
reported on 01/01/2010
GHG Emissions Reported
EPA GHG Reporting Program (2010)

Resources

Building Details

CBSA Odessa, TX
USGBC Chapter Chihuahuan Desert Chapter
EPA Region South Central
NHCS Urban Rural Classification Small metro
Utility Provider Oncor Electric Delivery Co.
industry type sectors Petroleum and Natural Gas Systems
total reported direct emissions in metric tons co2e 84,284 , 145,671 , 89,783 , 100,341
note Emissions data reported to EPA as of 8/18/2014
ghg quantity reported metric tons co2 111319
Report a Data Problem