5929 Arkansas 18

Building

Building 5929 Arkansas 18

Blytheville, AR, USA

Nucor-Yamato Steel Co

Details

Icon-transparency Transparency

This building has a 4 year timeline with 4 green activities.

Timeline

Nucor-Yamato Steel Co
reported on 01/01/2013
GHG Emissions Reported
EPA GHG Reporting Program (2013)
Nucor-Yamato Steel Co
reported on 01/01/2012
GHG Emissions Reported
EPA GHG Reporting Program (2012)
Nucor-Yamato Steel Co
reported on 01/01/2011
GHG Emissions Reported
EPA GHG Reporting Program (2011)
Nucor-Yamato Steel Co
reported on 01/01/2010
GHG Emissions Reported
EPA GHG Reporting Program (2010)

Resources

Building Details

CBSA Blytheville, AR
USGBC Chapter Arkansas Chapter
EPA Region South Central
NHCS Urban Rural Classification Micropolitan (nonmetropolitan)
Utility Provider Entergy Arkansas, Inc.
industry type sectors Metals
total reported direct emissions in metric tons co2e 416,721 , 586,278 , 462,654 , 523,474
note Emissions data reported to EPA as of 8/18/2014
Report a Data Problem