Dimitri Crescent

Building

Building Dimitri Crescent

Polokwane, SA

KPMG Polokwane Office

Details

Icon-transparency Transparency

This building has a 1 year timeline with 1 green activity.

Timeline

KPMG Polokwane Office
reported on 06/01/2013
Case Study
Green Star SA Case Studies

Resources

Building Details

project area in sq meters 1497
rating program Green Star SA office v1 Design
rating 4 Star
total points 47
Report a Data Problem